-

About The School

-

Infrastructure

-

Staff Profile

-

Principal Message

-

School Layout

-

Downloads

-

Road Map

-

News

-

Tenders

INFRASTRUCTURE

Area of land allotted (in acres)

27.52  ACRES

Whether land transferred in the Name of Samiti

13.75 Acre land has been transferred.

Vidyalaya shifted to permanent buildings on

1986

Status of Boundary Wall

Incomplete

a. Brick Wall
b. Barbed wire fencing

Not complete- Barbed wire fencing

Permanent buildings constructed

Yes (CBRI pattern and CPWD pattern)

School building

Incomplete

Dormitories

Boys -18 Nos.(08 for 10 beds and 10 for 24 beds).

Girls -10Nos.(08 for 10 beds and 02 for 24 beds)

Kitchen

Dining Hall


No. of shifts required for all students to take food

One


Two Numbers


-Three

Principal Residence

Yes, complete

Staff Quarters

Type III =08 Nos.
Type II = 18 Nos.
Temporary SP Shed (Tin shed)=15 No’s

M.P. Hall

Available

Workshop

Available

Type of O.H. Tank

Its capacity

Present Status

a) Column based

b) 1,30000_ liters

c) Working satisfactory

U.G. tank

Its capacity

Present Status

No

D.G. Set

One KIRLOSKER 10 KVA (1994-95) and is not in working

Sewage Pump

Not available

Water Pump

Not available

Electrification

Electric connection
Sub Station building
Street lighting

Numbers of hrs. During day when power supply is available on an average.

a) Urban Feeder YES
b) Complete
c)Available
d) 15hrs.

Playfields

400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court

a) Yes
b) not available
c)not available

d) Available

Water supply

Tube Well
Hand pump
Connection from PHED

a)Not handed over to Vidyalaya by the PHE.

�� 05 one in working order.
b) Potable,02- Nos.- working
c) 02- hours supply in a day

 

Rajiv Gandhi Smriti Van

Not available Yes

Fire fighting arrangement

Working

Last date of cleaning of
(a) Septic tank
(b) Water tanks

Nov.2015

2015

 

Whether area around transformer is fenced

Yes

Whether open wells, if any, are covered from top

No open well

Works taken up under M&R fund during current year and last year:-

Year

Name of work (M&R)

Expenditure

Sanctioned
(Rs. In lacs)

Cumulative expenditure during the year

2014-15

DAY TO DAY M&R WORK

4.50

4.50

2015-16

DAY TO DAY M&R WORK

4.50

3.25 up to 30.10.2015